Retrofit smart-switch sourcing

No Neutral Wire Smart Switch OEM

For renovation projects, the switch box often has only a live conductor. SSW supports selected single-live-wire smart-switch solutions for appropriate retrofit applications, alongside gateways, panels, lighting and sensors. We validate the wiring and load before recommending a SKU.

Request a SKU-level evaluation

What buyers must verify before ordering

1. Wiring

Confirm the wall-box conductors, gang count, two-way requirements and local electrical code. “No neutral” is a product-level feature, not a catalog-wide assumption.

2. Load

Confirm LED driver type, minimum and maximum load, dimming requirement and whether a bypass component is required for the chosen circuit.

3. Protocol

PLC, Zigbee 3.0 and Bluetooth Mesh capabilities vary by model. Select the protocol around the building, gateway and commissioning plan.

4. Ecosystem

Tuya / Smart Life integration is available on selected products. Matter interoperability requires a compatible gateway and must be confirmed per system.

Retrofit decision table

Project questionWhat SSW confirms in writing
Can the existing switch be replaced?Wiring topology, voltage, load and selected model's installation requirement.
Which protocol is suitable?SKU protocol, gateway requirement, local-control behavior and commissioning method.
Will it work with a target ecosystem?Specified Tuya / Smart Life behavior and, where relevant, compatible Matter-gateway scope.
What can be customized?Logo, packaging, panel finish, firmware/app configuration and the applicable MOQ.
What evidence is available?Model-specific data sheet, test scope, certification documentation and sample plan.

OEM process for a retrofit switch

  1. Share target market, voltage, wiring photos/diagram, load type and expected quantity.
  2. Select an existing SKU or define the customization scope.
  3. Review a written technical proposal: protocol, gateway, load and certification path.
  4. Test samples in the destination market before production approval.
  5. Confirm packaging, labeling, QC plan, lead time and shipment terms in the purchase order.

Frequently asked questions

Does no-neutral installation mean no electrical review is needed?

No. It reduces the need to add a neutral conductor at selected switch boxes, but local code, load compatibility and installation safety still require qualified review.

Can I request a Matter smart switch?

Tell us whether the request is for native Matter certification or gateway-mediated interoperability. They are different product and compliance requirements.

What is the MOQ?

MOQ depends on the selected product and customization level. A written quotation is the source of truth for MOQ, sampling, lead time and certification documents.

Start with the technical constraints

Send the target market, voltage, wiring arrangement, load type, protocol preference and estimated quantity. Our team can match those constraints to an appropriate model and sample plan.

Contact SSW Lighting