Cut lighting energy costs by 40%+, upgrade guest rooms without rewiring, and manage every floor from one central system. SSW delivers complete hotel lighting automation — from smart panels and sensors to PMS-integrated central control.
Corridors, lobbies and empty guest rooms burn electricity around the clock. Lighting is typically 20-30% of a hotel's energy bill — and most of it is wasted.
Guests fumble with confusing switches; staff can't tell occupied rooms from empty ones; scenes for cleaning, welcome and night mode simply don't exist.
Failed lamps and faulty circuits are reported by guests before staff notice. Without central monitoring, engineering teams chase problems floor by floor.
Four building blocks that work together out of the box — PLC for retrofits, BLE Mesh for new builds, Matter-ready for the future.
Bedside and entrance panels with labeled scenes — welcome, reading, night, away. No-neutral PLC versions for renovation projects.
Floor-level gateways connect every room to the central system — local control keeps working even if the network drops.
Human-presence and daylight sensors dim or switch off lighting in empty corridors, stairwells and back-of-house areas.
One dashboard for every floor: energy reports, fault alarms, scheduling and PMS-integrated check-in/check-out scenes.
📍 Xihu District, Hangzhou, China
Yes — PLC technology carries control signals over existing wiring, so rooms can be upgraded without opening walls or closing floors.
In our 500-room resort project, public-area lighting energy dropped 43% via presence sensing, daylight harvesting and scheduling.
Yes — check-in/check-out scenes, room status and energy management integrate with hotel PMS platforms.
The 500-room upgrade was delivered in 45 days including design, production and on-site commissioning.
Tell our AI consultant your room count and timeline — get a system recommendation and a direct line to our project engineering team.
Room count, timeline, new build or retrofit — our project team replies within 24 hours.